Figure
Cost structure of nuclear power projects
Metadata
Additional information
*Construction interest refers to cost of capital during the construction phase.
The table is a collection of literature review studies.
Permalinks
- Permalink to this version
- 4e5dca8b-2ef2-4c7e-a4b6-7da0f260d8c4
- Permalink to latest version
- I8WQUU78T4
Geographic coverage
Temporal coverage
For references, please go to https://www.eea.europa.eu/data-and-maps/figures/cost-structure-of-nuclear-power-projects-2 or scan the QR code.
PDF generated on 29 Jun 2022, 09:04 AM
Document Actions
Share with others