See all EU institutions and bodiesKey messages
About 1,176,000 public charging points were available for EVs in the EU in 2026. The number has been growing since 2012. New targets laid out in the Alternative Fuels Infrastructure Regulation (AFIR) are set in terms of geographical coverage of the recharging network and the power output per electric car fleet size, rather than the number of charging points.
The trans-European transport network (TEN-T) road coverage for core and comprehensive networks is already coming into shape for light-duty vehicles, reaching 73% of AFIR’s distance and power requirements as of July 2026. For heavy-duty vehicles, it stands at a very emerging stage with 3% coverage for TEN-T core and comprehensive networks as of June 2026.
As of 2023 (data access October 2025), 40% of the EU’s TEN-T core ports were equipped with a shore-side electricity supply, for a total of 461 berths. Comprehensive TEN-T ports provide it in 8% of the cases (78 berths). In addition, the EU-27 has 67 liquefied natural gas (LNG) bunkering facilities.
To sustain the energy transition of the transport system, different and complex infrastructures are required. These must be developed and scaled up quickly. Several EU policy initiatives address this issue, including via the TEN-T Regulation supported by the Connecting Europe Facility (CEF), and more recently the AFIR and the Energy Performance of Buildings Directive (EPBD).
Roads
In 2026, the EU’s fleet of cars and vans (light-duty M1 and N1 categories) included 9.4 million battery-powered electric vehicles (BEV), a 16% rise from 2025, and about 5.6 million plug-in hybrid vehicles (PHEV), a 12% increase. This growing electric vehicle (EV) fleet is increasingly supported by the expansion of the EU’s charging infrastructure. Publicly accessible EV charging points increased from 10,507 in 2012 to 1,176,554 (spread across 416,782 charging locations) in October 2026 (see Figure 14). The vast majority are medium-speed alternating current (AC) points (between 7.4 kW and 22 kW). The number of ultra-fast direct current (DC) chargers has also been growing rapidly in recent years, with a total of about 140,926 spread across 31,805 charging locations as of October 2026. The availability, reliability, accessibility and geographic distribution of this infrastructure are essential to enable the electrification and decarbonisation of Europe’s road transport sector, particularly as a dense public charging network is required for longer journeys and where home or workplace charging is unavailable.
Figure 14. Publicly accessible charging points by type of charger
To further support electrification, the AFIR sets out targets for the deployment of EV charging infrastructure. Alongside distance-based targets for the whole TEN-T road network, it introduces a fleet-based target that links installed charging power capacity to fleet composition: 1.3 kW of charging power capacity should be available for each BEV and 0.8 kW for each PHEV. The EC’s European Alternative Fuels Observatory (EAFO) monitors these requirements by comparing reported public charging power with the target calculated from national vehicle fleets.
According to the latest data reported by the EAFO, from May 2026, the EU’s charging power capacity was 42.2 GW (greatly exceeding the corresponding estimated target of 16.7 GW). As reported power output may be overestimated in some 27 Member States (EU-27), efforts are ongoing to improve the accuracy of the data. Applying the AFIR fleet-based requirement (1.3 kW of publicly accessible charging power per BEV and 0.8 kW per PHEV) to a projected 2030 fleet of 34.3 million BEVs and 13.7 million PHEVs provides an indicative 2030 target of 55.6 GW.
Alongside these national targets, AFIR requires charging pools for light-duty vehicles at least every 60 km in each direction of travel on TEN-T core and comprehensive road networks, with full coverage by the end of 2030. The AFIR also requires each charging pool in the core network to have provided at least 400 kW of power by the end of 2025. Those in the comprehensive network must provide at least 300 kW each by the end of 2027. While charging infrastructure is emerging on major routes, it should be noted that coverage and power alone do not establish whether pools offer sufficient support and accessibility for reliable long-distance travel. These factors also depend on traffic flows, fleet sizes and seasonal peaks, as well as on access to private charging, which varies across Member States. Figure 15 maps the current implementation of the AFIR’s targets for charging pools for light-duty vehicles in relation to compliance with the distance and power requirements of the AFIR 2027/2030 LDV targets for the TEN-T comprehensive road network (pools every 60 km, each pool at least 300 kW) as of July 2026. Overall, 72.8% of the EU’s TEN-T core and comprehensive road networks meets the distance and power requirements for light-duty vehicles.
Figure 15. Implementation status of the core and comprehensive TEN-T networks for light-duty vehicles
Please select a resource that has a preview image available.
The infrastructure challenge is more pronounced for heavy-duty vehicles. AFIR requires publicly accessible recharging pools dedicated to heavy-duty to be progressively deployed along the TEN-T network, with minimum pool power and maximum spacing requirements that differ between the core and comprehensive networks. Charging pools must cover 15% of the TEN-T network at 1,400 kW by the end of 2025. Coverage must reach 50% at 1,400 kW on the comprehensive network and 2,800 kW on the core network by the end of 2027 and by the end of 2030 the entire core network should have charging pools every 60 km at 3,600 kW each. Figure 16 maps the status as of June 2026 of the AFIR’s TEN-T targets for publicly accessible heavy-duty charging pools: deployed every 60 km and each pool at least 1,400 kW (AFIR’s 2025 power requirements). Overall, only 3% of the EU’s TEN-T road network meets both these distance and power requirements for heavy-duty vehicles. The results indicate where infrastructure is available but remains insufficiently dense or insufficiently powerful to meet targets.
Figure 16. Implementation status of the core and comprehensive TEN-T networks for heavy-duty vehicles
Please select a resource that has a preview image available.
Nonetheless, the deployment of charging infrastructure for heavy-duty vehicles accelerated during 2026. From January to September 2026 the EU’s heavy-duty charging points increased from 1,791 AFIR-compliant charging locations to 3,021, according to the EC’s Joint Research Centre (JRC), using data provided by Eco-Movement. Of these, the number of charging points in charging locations dedicated exclusively to heavy-duty vehicles increased from 552 to 712. Additionally, considering high power charging points, with megawatt charging system connectors enabling substantially higher charging power for long-haul applications than with combined charging connectors, there were 28 megawatt charging points in Europe by mid-2026, with Germany having over 80% of the total. Still in a very early deployment phase, high charging power can be targeted by also considering simultaneous charging capability, site access conditions and grid connection capacity. AFIR recognises that heavy-duty vehicle infrastructure requires a different approach compared to light-duty charging by combining corridor coverage, adequate pool-level power and the scalability of sites accessible to heavy-duty vehicles.
Infrastructure deployment must also be coordinated with electricity-system planning. Grid-connection delays, particularly for high-power charging hubs, can constrain roll-out even where demand and funding are available. Supported by the AFIR, the EPBD and the RED III, smart charging, interoperability, transparent data and, where technically appropriate, bidirectional charging can improve the integration of EVs into the electricity system.
Box 8 Infrastructure needs for heavy-duty vehicles in the European Union
Charging infrastructure for HDV cannot be approached as a single infrastructure category according to a recent European Environment Agency briefing. The appropriate charging solution depends on the operational profile of a vehicle, particularly its daily energy demand, dwell time, route predictability and return to a fixed base. Depot charging is likely to become the backbone of electrification because it combines operational predictability with comparatively favourable charging costs. Urban and regional trucks, urban buses and many vocational vehicles operate on predictable routes and return to a fixed base, which favours depot charging. Long-haul trucks and coaches generally rely on depot charging for part of their energy needs but also require a dense and reliable network of high-power en-route charging stations and opportunity charging at logistical hubs.
Increasingly stringent vehicle CO₂ standards under the AFIR’s requirements and improvements in high-power charging technology are already driving the development of this infrastructure. Nevertheless, infrastructure availability remains a significant constraint. Grid capacity and lengthy grid-connection procedures are key barriers to overcome, alongside high upfront investment costs, uncertain utilisation, suitable land availability and the operational reliability of public charging.
Publicly accessible HDV charging remains at an early stage and is heavily concentrated in a few northern and central Member States and corridors. Although deployment is accelerating, uneven progress towards the AFIR’s initial coverage objectives and the TEN-T network may jeopardise the timely delivery of future charging targets. Therefore, the immediate challenge is not simply to increase the number of charging points. The infrastructure needs to provide sufficient power, be accessible to heavy-duty vehicles, correspond to actual freight flows and offer predictable availability. A corridor-based approach, in which charging infrastructure deployment requirements are linked to actual freight flows, charging windows and expected utilisation, may be appropriate for early deployment. Coordinated planning between transport operators, charging providers, grid operators and public authorities will be essential as electric HDV deployment accelerates.
The revised Energy Performance of Buildings Directive (EPBD) strengthens requirements for the development of EV charging infrastructure in and adjacent to buildings. This includes provisions on pre-cabling (to enable the installation of charging points at a later stage with minimal effort) for new and renovated buildings and stricter requirements on the number of recharging points in both residential and non-residential buildings. This is particularly important for destination, workplace and depot charging, which will be central to the electrification of vans, urban freight fleets and many heavy-duty operations.
Box 9 Germany: a comprehensive, needs-based, and user-friendly charging infrastructure
According to the EAFO figures from 2026, Latvia, Bulgaria, Estonia, Slovakia and Romania have the highest ratios of installed public recharging power per EV registered. When total installed power output is also considered, Germany, France and the Netherlands stand out. This box illustrates the actions taken by Germany to develop its energy charging infrastructure as reported to the EC.
In 2024 the Federal Ministry of Transport (BMDV) implemented measures to expand the charging and refuelling infrastructure for road transport. The measures aim to encourage the widespread acceptance of electromobility, notable through the Deutschlandnetz, a nationwide, ultra-fast EV charging network. BMDV aims to create 9,000 additional fast-charging points for electric cars, focusing mainly on underserved regions, cities and unstaffed motorway service areas. Private companies have been constructing over 1,000 locations on behalf of the BMDV, with around 900 locations in urban and rural areas and 200 directly on motorways. Completion of the points is planned for 2026.
For battery-powered electric heavy goods vehicles, a fast-charging network of publicly accessible charging infrastructure for trucks is also being developed along federal motorways at both serviced and unstaffed service areas. This fast-charging network will provide basic charging infrastructure for electric trucks during the ramp-up phase until 2030, when there will be approximately 4,200 charging points at around 350 locations. These include megawatt and combined charging system points that meet the specific requirements of heavy-duty vehicles. Due to the limited availability of space on federal land, the anticipated charging demand cannot be fully met by these additions to the infrastructure. Private development activities, particularly in areas with dynamic economic growth, will still be necessary. Furthermore, the BMDV is incentivising the ramp-up of charging infrastructure at depots through appropriate market-activating measures, where a large proportion of charging will take place at depots on private land owned by truck operators.
For rail transport, the Investment Acceleration Act, the Planning Acceleration Act III, and the Approval Acceleration Act, enacted in 2020 and 2023, are intended to enable transportation infrastructure to be planned and implemented more quickly in the future, among other goals. The Approval Acceleration Act established that the construction or modification of selected federal rail lines is a matter of overriding public interest, as is the expansion of fast-charging infrastructure along federal highways. The federal government is also planning additional measures to accelerate planning and implementation to expedite the rollout of a climate friendly transportation infrastructure (see also the final report of the Rail Acceleration Commission).
Ports
Ports are key nodes of the Trans-European Transport Network (TEN-T), which is governed by Regulation (EU) 2024/1679. This regulation aims to develop a multi-modal transport network across Europe. The TEN-T is structured in three layers: the core network, comprising connections of highest strategic importance, to be completed by 2030; the extended core network, to be completed by 2040; and the comprehensive network, covering all EU regions, to be completed by 2050.
The AFIR, which replaced AFID as part of the Fit for 55 policy package, sets binding targets for the supply of shore-side electricity at maritime and inland waterway TEN-T ports. The AFIR mandates EU Member States to provide a minimum shore-side electricity supply for seagoing container ships and seagoing passenger ships in TEN-T maritime ports. The requirement is based on port activity levels and must be met by 31 December 2029. At least one shore-side electricity infrastructure must be provided at each TEN-T core inland waterway port by 31 December 2024 and at each TEN-T comprehensive inland waterway port by 31 December 2029. Shore-side electricity, also known as on-shore power supply (OPS), avoids auxiliary diesel generators for operations and other services while ships are at berth, reducing emissions and noise. In its current implementation, OPS is not intended to address the high emissions of pollutants during the cold start of ship engines at ports and the subsequent impact on local air quality. However, practical constraints such as grid capacity, berth suitability, use rates and vessel-side readiness remain as challenges.
The regulatory framework continues to evolve through updated implementing and delegated acts that specify technical requirements, data sharing, and standards under the AFIR umbrella. For example, in 2025, the Commission adopted Implementing Regulation (EU) 2025/655 and Delegated Regulation (EU) 2025/671, which update technical specifications and data provisions, enhancing transparency, monitoring, and data quality for energy infrastructure deployment.
Figure 17 presents the most recent data on OPS availability in the ports of Member States and some neighbouring countries. The map includes both maritime and inland waterways ports. Currently 71 out of 179 of Member States’ TEN-T core ports have OPS (a total of 461 berths), and 31 out of 371 TEN-T comprehensive network ports are equipped with shore-side electricity (78 berths).
Figure 17. OPS availability in Member States and some neighbouring countries
The EU’s Ports Strategy highlights the need to plan port electrification jointly with electricity network operators and port users. Grid capacity and connection lead times, the ability to serve several berths simultaneously, vessel compatibility and electricity prices affect the deployment and use of OPS. Battery-powered electric ferries and inland waterway vessels may also need dedicated charging infrastructure for propulsion, scaled to their energy needs along routes and turnaround times.
The AFIR also sets targets for the supply of liquefied methane in TEN-T core maritime ports (i.e. excluding inland waterway ports). It requires Member States to ensure an ‘appropriate number of refuelling points’ for liquefied methane by 31 December 2024. AFIR does not include requirements on the sustainability of the fuel provided, meaning liquefied methane of fossil origin could still be used.
However, the Fuel EU Maritime regulation and related provisions applied from 1 January 2025, with the exception of Article 8 (monitoring plan) and Article 9 (modifications to the monitoring plan) which applied from 31 August 2024. This regulation aims to increase the uptake of low- and zero-carbon fuels in maritime transport, by requiring a progressive reduction in the GHG intensity of the energy (measured in grams of carbon dioxide equivalent per megajoule (gCO2e/MJ)) used on board ships above 5,000 gross tonnage calling at EU ports. GHG intensity must fall by at least 2% by 2025 and 6% by 2030, and thereafter in 5-year steps to 80% by 2050. Certain exemptions will be allowed until 2030. Reductions will be estimated from a reference value (91.16 gCO2e/MJ) calculated on the basis of data reported under MRV for 2020. Figure 18 provides the most recent data on LNG bunkering facilities in the EU-27 and some neighbouring countries. There are 67 ports with LNG bunkering capacity in the EU-27, of which 45 are reported to belong to the core network.
Figure 18. LNG bunkering facilities in the EU-27
Ports are key enablers in the uptake of renewable and low-carbon marine fuels as they provide the infrastructure, grid connections and clean-energy hubs needed for their supply and use. The EU’s ports strategy supports this transformation through electrification, improved grid access and clean-energy cooperation. The EU’s sustainable transport investment plan seeks to mobilise investment to scale up renewable and low-carbon fuel production for waterborne transport while helping bridge the gap between growing demand due to the EU’s FuelEU Maritime requirements and the availability of sustainable fuels.
- Following AFIR guidelines, an AFIR‑compliant location must have at least one recharging point with a theoretical power output of 350 kW or more.↵
- ↵Shore-side electricity refers to the provision of electrical power through a standardised interface to seagoing ships or inland waterway vessels at berth. https://alternative-fuels-observatory.ec.europa.eu/general-information/glossary
- Infrastructure becoming operational in and before 2023; data downloaded 7 October 2025. Updated data for 2024 was not yet available at the time of publication of this report.a b